Square zone Rectangular zone
Example 1: square building Example 2: rectangular building
1
st
floor 1
st
floor
2
nd
floor 2
nd
floor
It is possible to alter the number of base stations used
from one floor to another for this type of building.
The technique used is overlapping the location of base stations from one level to another. This
technique can be used for alternate floors if the coverage of a level can be achieved from an
adjacent level.
4.10.2.3.3 Coverage depending on the infrastructure
  &'(
       